---
schema_version: "secwatch.filing_event.v1"
accession: "0001193125-25-224311"
form_type: "8-K"
ticker: "WBI"
cik: "0002064947"
company_name: "WaterBridge Infrastructure LLC"
filed_at: "2025-09-30T23:59:59+00:00"
generated_at: "2026-05-17T05:19:33.911199+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# WaterBridge reaches FID on Speedway Pipeline; $290M first phase, in-service mid-2026

## Summary
- Final investment decision for Speedway Pipeline first phase; construction Q4 2025, in-service by mid-2026.
- Initial capacity 500,000 bpd, expandable to 2.0 million bpd.
- Development cost $290M: $220M pipeline/handling facilities, $70M upstream gathering.
- Pipeline connects Eddy and Lea counties (NM) to Central Basin Platform pore space owned by LandBridge.
- Provides access to ~1.0 million bpd of approved produced water handling capacity.

## SEC filing metadata
- accession: 0001193125-25-224311
- form_type: 8-K
- ticker: WBI
- cik: 0002064947
- company_name: WaterBridge Infrastructure LLC
- filed_at: 2025-09-30T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 7.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/2064947/000119312525224311/0001193125-25-224311-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/2064947/000119312525224311/wbi-20250929.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001193125-25-224311
- JSON: https://secwatch.observer/filing/0001193125-25-224311.json
- Plain text: https://secwatch.observer/filing/0001193125-25-224311.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
