{"schema_version":"secwatch.filing_event.v1","accession":"0001193125-25-278058","form_type":"8-K","ticker":"DYNR","cik":"0001111741","company_name":"DYNARESOURCE, INC.","filed_at":"2025-11-13T23:59:59+00:00","discovered_at":"2026-05-14T18:02:38.819118+00:00","generated_at":"2026-05-16T20:08:35.882455+00:00","sec_items":["9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.65,"calibrated_materiality_score":0.65,"confidence":"high","headline":"DynaResource commissions gravity gold recovery circuit at San Jose de Gracia mine; targets >80% recovery","bullets":["Three Falcon gravity concentrators installed after ball mills; wet commissioning complete, ramp-up to design capacity by end of October 2025.","Flotation circuit previously recovered ~75% of contained gold; new circuit expected to boost recoveries to >80% by capturing free gold.","Sepro Mineral Systems Corp. contracted for startup technical assistance to optimize mill efficiency and maintenance."],"urls":{"canonical":"https://secwatch.observer/filing/0001193125-25-278058","json":"https://secwatch.observer/filing/0001193125-25-278058.json","markdown":"https://secwatch.observer/filing/0001193125-25-278058.md","text":"https://secwatch.observer/filing/0001193125-25-278058.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1111741/000119312525278058/0001193125-25-278058-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1111741/000119312525278058/dynr-20251023.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-16T20:08:35.882455+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}