secwatch.observer — SEC 8-K summary ====================================== Issuer: DYNARESOURCE, INC. (DYNR) CIK: 0001111741 Form: 8-K Filed at: 2025-11-13T23:59:59+00:00 Accession: 0001193125-25-278058 Event type: other_material Sentiment: positive Materiality: 0.65 Item codes: 9.01 LLM model: deepseek-v4-flash:cloud@v2 DynaResource commissions gravity gold recovery circuit at San Jose de Gracia mine; targets >80% recovery -------------------------------------------------------------------------------- - Three Falcon gravity concentrators installed after ball mills; wet commissioning complete, ramp-up to design capacity by end of October 2025. - Flotation circuit previously recovered ~75% of contained gold; new circuit expected to boost recoveries to >80% by capturing free gold. - Sepro Mineral Systems Corp. contracted for startup technical assistance to optimize mill efficiency and maintenance. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1111741/000119312525278058/0001193125-25-278058-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/1111741/000119312525278058/dynr-20251023.htm HTML page: https://secwatch.observer/filing/0001193125-25-278058 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer