---
schema_version: "secwatch.filing_event.v1"
accession: "0001193125-25-283425"
form_type: "8-K"
ticker: "OGE"
cik: "0001021635"
company_name: "OGE ENERGY CORP."
filed_at: "2025-11-17T23:59:59+00:00"
generated_at: "2026-05-16T19:04:26.492386+00:00"
event_type: "regulatory"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# OGE Energy gets OCC pre-approval for 448 MW gas turbines, updates 5-year capex to $7.3B

## Summary
- OCC approved need and rider recovery for Horseshoe Lake Units 13 & 14; CWIP and return on CPAs not approved.
- Units of 448 MW total capacity scheduled in service by end of 2029.
- Updated capital plan: $7.285B total for 2026-2030, including $570M generation capacity projects.
- Reiterates long-term EPS growth target of 5-7%, targeting top half through 2028.
- Financing expected from debt and equity to maintain strong investment grade credit ratings.

## SEC filing metadata
- accession: 0001193125-25-283425
- form_type: 8-K
- ticker: OGE
- cik: 0001021635
- company_name: OGE ENERGY CORP.
- filed_at: 2025-11-17T23:59:59+00:00
- event_type: regulatory
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 8.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1021635/000119312525283425/0001193125-25-283425-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/74145/000119312525283425/oge-20251113.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001193125-25-283425
- JSON: https://secwatch.observer/filing/0001193125-25-283425.json
- Plain text: https://secwatch.observer/filing/0001193125-25-283425.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
