other material
confidence high
sentiment positive
materiality 0.60
i-80 Gold reports high-grade drill results at Granite Creek Underground; 40.4 g/t Au over 13.2 m
i-80 Gold Corp.
- Best intercept: 40.4 g/t Au over 13.2 m (hole iGU25-31); also 31.3 g/t Au over 7.8 m (iGU25-15).
- 2025 program: 16,000 m drilled over 46 holes; 7 step-out holes confirm expansion potential north and at depth.
- Measured & indicated resource: 261,000 oz Au at 10.5 g/t; inferred 326,000 oz Au at 13.0 g/t as of Dec 31, 2024.
- Feasibility study expected late Q1 2026 with results in Q2 2026; PEA outlined ~8-year mine life at 60,000 oz Au/yr.
- Drilling reinforces geological model; SPZ remains open to north and depth for future campaigns.