{"schema_version":"secwatch.filing_event.v1","accession":"0001213900-24-021909","form_type":"8-K","ticker":"BTCT","cik":"0001796514","company_name":"BTC Digital Ltd.","filed_at":"2024-03-13T23:59:59+00:00","discovered_at":"2026-05-14T18:03:25.563561+00:00","generated_at":"2026-06-04T22:27:58.860013+00:00","sec_items":["1.01","3.02","9.01"],"event_type":"m_and_a","sentiment":"positive","materiality_score":0.75,"calibrated_materiality_score":0.75,"confidence":"high","headline":"BTC Digital acquires North Carolina BTC mining facility for $3.4M, including $400K in shares","bullets":["Total consideration of $3.4 million; $400,000 paid in ordinary shares valued at 5-day average closing price.","Facility with 10MW electrical load; delivery scheduled on or before May 31, 2024.","Acquisition expected to lower operational costs and provide long-term stable energy supply.","Buyer is wholly owned subsidiary Meten Service USA Corp.; Seller is Alpha Plotter, LLC.","Equity issued as part of consideration constitutes an unregistered sale of securities."],"urls":{"canonical":"https://secwatch.observer/filing/0001213900-24-021909","json":"https://secwatch.observer/filing/0001213900-24-021909.json","markdown":"https://secwatch.observer/filing/0001213900-24-021909.md","text":"https://secwatch.observer/filing/0001213900-24-021909.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1796514/000121390024021909/0001213900-24-021909-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1796514/000121390024021909/ea0201676-8k_btcdigital.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-04T22:27:58.860013+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[{"claim_id":"4556b502e394df58ecf721cc352b631d6977f558","claim":"BTC Digital Ltd. entered into Acquisition Agreement with Alpha Plotter, LLC valued at $3.4 million (effective 2024-03-09).","evidence_excerpt":"On March 9, 2024, and Meten Service USA Corp. (“Meten”), a wholly owned subsidiary of BTC Digital Ltd. (the “Company”), entered into an acquisition and purchase agreement (the “Acquisition Agreement”) with Alpha Plotter, LLC (the “Seller”) to acquire the Seller’s BTC mining facility under construction in North Carolina (the “Facility”).","evidence_source":"SEC 8-K Item 1.01/1.02","evidence_url":"https://www.sec.gov/Archives/edgar/data/1796514/000121390024021909/0001213900-24-021909-index.htm","confidence":0.9,"family_label":"Material Agreements","details":[{"label":"Action","value":"entry"},{"label":"Agreement","value":"asset purchase"},{"label":"Counterparty","value":"Alpha Plotter, LLC"},{"label":"Value","value":"$3.4 million"},{"label":"Effective","value":"2024-03-09"}],"fact_type":"material_agreement"}],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}