other material
confidence high
sentiment positive
materiality 0.85
Air Industries Group secures $110M GTF engine components contract, backlog tops $280M
AIR INDUSTRIES GROUP
- Secured $110M, 7-year contract for thrust struts used in GTF aircraft jet engines; sole supplier since 2015.
- Contract replaces and expands existing deal expiring Dec 2024; runs Jan 2025 through 2031.
- Backlog surges to over $280M, first time exceeding a quarter-billion dollars.
- Production expected to require ~40,000 hours annually at Long Island facility; top and bottom lines to benefit.