---
schema_version: "secwatch.filing_event.v1"
accession: "0001213900-25-034821"
form_type: "8-K"
ticker: "AIRJ"
cik: "0001855474"
company_name: "AirJoule Technologies Corp."
filed_at: "2025-04-24T23:59:59+00:00"
generated_at: "2026-05-23T07:18:28.622068+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# AirJoule raises $15M via PIPE anchored by GE Vernova; launches waste heat-to-water project

## Summary
- Issued ~3.75M new shares at ~$4.00/sh for $15M gross proceeds; expected close April 25, 2025.
- GE Vernova anchors PIPE; follows its $5M initial JV investment in March 2024.
- Net proceeds to accelerate commercialization of AirJoule A1000 units (1,000-3,000 L/day each); pilot deployments in 2025.
- Company and GE Vernova to explore AirJoule integration to convert low-grade waste heat to pure water for data centers and industry.
- AirJoule system achieves <160 Wh/L water production using waste heat from industrial operations.

## SEC filing metadata
- accession: 0001213900-25-034821
- form_type: 8-K
- ticker: AIRJ
- cik: 0001855474
- company_name: AirJoule Technologies Corp.
- filed_at: 2025-04-24T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 1.01, 3.02, 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1855474/000121390025034821/0001213900-25-034821-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1855474/000121390025034821/ea0239360-8k_airjoule.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001213900-25-034821
- JSON: https://secwatch.observer/filing/0001213900-25-034821.json
- Plain text: https://secwatch.observer/filing/0001213900-25-034821.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
