---
schema_version: "secwatch.filing_event.v1"
accession: "0001213900-25-038479"
form_type: "8-K"
ticker: "TE"
cik: "0001992243"
company_name: "T1 Energy Inc."
filed_at: "2025-05-01T23:59:59+00:00"
generated_at: "2026-05-23T01:13:46.786735+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.7
calibrated_materiality_score: 0.7
confidence: "high"
source: SEC EDGAR
---

# T1 Energy converts G1 Dallas construction loan to term loan, produces 443 MW in Q1

## Summary
- Construction loan converted to term loan on April 30, 2025 after third-party certification; maturity December 31, 2029.
- Q1 2025 production of 443 MW PV solar modules, representing 96% of production plan.
- Three production lines reconfigured during Q1 to produce TOPCon modules for market conditions.
- Facility in Wilmer, TX has total annual production capacity of 5 GW and is fully operational.

## SEC filing metadata
- accession: 0001213900-25-038479
- form_type: 8-K
- ticker: TE
- cik: 0001992243
- company_name: T1 Energy Inc.
- filed_at: 2025-05-01T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.7
- calibrated_materiality_score: 0.7
- confidence: high
- sec_items: 1.01, 2.03, 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1992243/000121390025038479/0001213900-25-038479-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1992243/000121390025038479/ea0240465-8k_t1energy.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001213900-25-038479
- JSON: https://secwatch.observer/filing/0001213900-25-038479.json
- Plain text: https://secwatch.observer/filing/0001213900-25-038479.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
