---
schema_version: "secwatch.filing_event.v1"
accession: "0001213900-25-107574"
form_type: "8-K"
ticker: "BGDE"
cik: "0001218683"
company_name: "Big Digital Energy, Inc."
filed_at: "2025-11-07T23:59:59+00:00"
generated_at: "2026-05-16T22:56:29.430292+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.2
calibrated_materiality_score: 0.2
confidence: "high"
source: SEC EDGAR
---

# Mawson Infrastructure extends Bellefonte, PA lease to Dec 2030

## Summary
- Exercised 5-year renewal option on 9,918 sq ft mining facility in Bellefonte, PA.
- Lease now runs through December 31, 2030 (was set to expire Dec 31, 2025).
- Facility supports AI, HPC, and Bitcoin mining operations.
- No financial terms of lease extension disclosed.

## SEC filing metadata
- accession: 0001213900-25-107574
- form_type: 8-K
- ticker: BGDE
- cik: 0001218683
- company_name: Big Digital Energy, Inc.
- filed_at: 2025-11-07T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.2
- calibrated_materiality_score: 0.2
- confidence: high
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1218683/000121390025107574/0001213900-25-107574-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1218683/000121390025107574/ea0264610-8k_mawson.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001213900-25-107574
- JSON: https://secwatch.observer/filing/0001213900-25-107574.json
- Plain text: https://secwatch.observer/filing/0001213900-25-107574.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
