---
schema_version: "secwatch.filing_event.v1"
accession: "0001213900-25-123321"
form_type: "8-K"
ticker: "WYFI"
cik: "0002042022"
company_name: "WhiteFiber, Inc."
filed_at: "2025-12-18T23:59:59+00:00"
generated_at: "2026-05-16T12:48:56.254768+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.85
calibrated_materiality_score: 0.85
confidence: "high"
source: SEC EDGAR
---

# WhiteFiber signs 10-year, $865M colocation deal with Nscale for 40 MW at NC-1 campus

## Summary
- Total contracted revenue ~$865M over 10-year term with 3% annual escalators, excluding electricity passthrough.
- 40 MW IT load deployed in two 20 MW phases; billing for Phase 1 starts April 30, 2026, Phase 2 May 30, 2026.
- NC-1 facility is Tier 3-equivalent, supports up to 150 kW/cabinet with N+1 cooling; targeted PUE ≤1.3.
- WhiteFiber has invested ~$150M equity in site; expects to formalize a credit facility early Q1 2026.
- Nscale gets priority on future capacity; WhiteFiber sees potential to double deployment to 80 MW by end of 2027.

## SEC filing metadata
- accession: 0001213900-25-123321
- form_type: 8-K
- ticker: WYFI
- cik: 0002042022
- company_name: WhiteFiber, Inc.
- filed_at: 2025-12-18T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.85
- calibrated_materiality_score: 0.85
- confidence: high
- sec_items: 1.01, 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/2042022/000121390025123321/0001213900-25-123321-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/2042022/000121390025123321/ea0269918-8k_white.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001213900-25-123321
- JSON: https://secwatch.observer/filing/0001213900-25-123321.json
- Plain text: https://secwatch.observer/filing/0001213900-25-123321.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
