secwatch.observer — SEC 8-K summary ====================================== Issuer: INTEGRATED RAIL & RESOURCES INC. (—) CIK: 0002044112 Form: 8-K/A Filed at: 2026-06-23T20:42:12+00:00 Accession: 0001213900-26-071148 Event type: other_material Sentiment: neutral Materiality: 0.60 Item codes: 7.01, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Integrated Rail revises Shell agreement: fixed costs cut to $8.64M/yr, product fee $2.29; project at FEL-3 -------------------------------------------------------------------------------- - Annual fixed operating costs under Shell arrangement reduced from ~$13.4M to $8.64M; per-barrel product fee raised from $2.21 to $2.29. - Engineering status advanced to 'FEL-3' (Front-End Loading 3), confirming $80M cost estimate for facility repurposing remains unchanged. - Long-term offtake/tolling deal with Shell includes $11.4M annual capital cost payment and 50% gross refining margin fee. - Expansion plan targets 16,500 bbl/d by 2027, 50,000 bbl/d by 2030, with $85M additional capex in 2028. - Approximately 25% of pro forma shares subject to lockup until facility fully operational. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/2044112/000121390026071148/0001213900-26-071148-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/2044112/000121390026071148/ea0295535-8ka1_integrated.htm HTML page: https://secwatch.observer/filing/0001213900-26-071148 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer