---
schema_version: "secwatch.filing_event.v1"
accession: "0001213900-26-076376"
form_type: "8-K"
ticker: "AIB"
cik: "0002070542"
company_name: "BlockchAIn Digital Infrastructure, Inc."
filed_at: "2026-07-08T20:15:20+00:00"
generated_at: "2026-07-08T20:16:08.632614+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# AIB Data Centers unveils 570 MW pipeline, Q1 results, and growth outlook in investor presentation

## Summary
- 65 MW energized at CLT-01 site; ~140 MW under development and ~570 MW total pipeline across 6 active sites.
- Q1 2026 revenue $4.9M (+9% YoY); adjusted EBITDA -$0.2M; net loss $0.3M; EPS -$0.01.
- Pro forma cash $60.4M after June 2026 follow-on offering of 38.3M shares at $1.65.
- Analyst consensus: 2 Buy ratings; avg price target $5.88 (Maxim $5.00, Lucid $6.75).
- Management targets revenue start H1 2027 for CLT-01; pipeline includes DFW-A, MN, DEN-01, HSV-01, CLT-02.

## SEC filing metadata
- accession: 0001213900-26-076376
- form_type: 8-K
- ticker: AIB
- cik: 0002070542
- company_name: BlockchAIn Digital Infrastructure, Inc.
- filed_at: 2026-07-08T20:15:20+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/2070542/000121390026076376/0001213900-26-076376-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/2070542/000121390026076376/ea0297302-8k_aibdata.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001213900-26-076376
- JSON: https://secwatch.observer/filing/0001213900-26-076376.json
- Plain text: https://secwatch.observer/filing/0001213900-26-076376.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
