---
schema_version: "secwatch.filing_event.v1"
accession: "0001213900-26-090492"
form_type: "8-K"
ticker: "WYFI"
cik: "0002042022"
company_name: "WhiteFiber, Inc."
filed_at: "2026-08-17T12:00:16+00:00"
generated_at: "2026-08-17T12:06:20.659617+00:00"
event_type: "m_and_a"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# WhiteFiber to acquire two NC data center sites for $60M, adding 60 MW initial capacity

## Summary
- Purchase price $60.0M cash; earnest money deposit $2.25M; closing expected Q4 2026.
- Properties in Yadkin County, NC to become data centers NC-2 and NC-3, near existing NC-1 campus.
- Combined minimum 60 MW initial gross utility capacity; potential up to ~200 MW over time.
- Targeting initial ready-for-service capacity in Q3 2027; non-binding LOIs with investment-grade credit support.
- Seller is Unifi Manufacturing, Inc. (UMI), subsidiary of Unifi, Inc.; inspection period ends Sept 15, 2026.

## SEC filing metadata
- accession: 0001213900-26-090492
- form_type: 8-K
- ticker: WYFI
- cik: 0002042022
- company_name: WhiteFiber, Inc.
- filed_at: 2026-08-17T12:00:16+00:00
- event_type: m_and_a
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 1.01, 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/2042022/000121390026090492/0001213900-26-090492-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/2042022/000121390026090492/ea0302334-8k_whitefiber.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001213900-26-090492
- JSON: https://secwatch.observer/filing/0001213900-26-090492.json
- Plain text: https://secwatch.observer/filing/0001213900-26-090492.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
