---
schema_version: "secwatch.filing_event.v1"
accession: "0001213900-26-099458"
form_type: "8-K"
ticker: "ANY"
cik: "0001591956"
company_name: "Sphere 3D Corp."
filed_at: "2026-09-14T12:00:21+00:00"
generated_at: "2026-09-14T12:05:41.550870+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.5
calibrated_materiality_score: 0.5
confidence: "high"
source: SEC EDGAR
---

# Sphere 3D unveils AI infrastructure sites; planned capacities up to 50 MW

## Summary
- Investor presentation posted Sept 14, 2026 outlines AI infrastructure projects at four sites.
- Blackjack site planned 30 MW, Truckstop planned 50 MW; Rockwood 10 MW, Brickyard 15 MW.
- Company operates as DarkHorse Technologies, focusing on overlooked locations for AI infrastructure.

## SEC filing metadata
- accession: 0001213900-26-099458
- form_type: 8-K
- ticker: ANY
- cik: 0001591956
- company_name: Sphere 3D Corp.
- filed_at: 2026-09-14T12:00:21+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.5
- calibrated_materiality_score: 0.5
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1591956/000121390026099458/0001213900-26-099458-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1591956/000121390026099458/ea0305367-8k_sphere.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001213900-26-099458
- JSON: https://secwatch.observer/filing/0001213900-26-099458.json
- Plain text: https://secwatch.observer/filing/0001213900-26-099458.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
