---
schema_version: "secwatch.filing_event.v1"
accession: "0001214659-26-007704"
form_type: "8-K"
ticker: "GPUS"
cik: "0000896493"
company_name: "Hyperscale Data, Inc."
filed_at: "2026-06-24T20:30:29+00:00"
generated_at: "2026-06-24T20:32:44.789123+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.85
calibrated_materiality_score: 0.85
confidence: "high"
source: SEC EDGAR
---

# Hyperscale Data signs 20MW AI colocation deal worth up to $3.0B at Michigan campus

## Summary
- MSA with California neocloud for 20 MW critical AI compute capacity at Dowagiac, MI campus; Q4 2026 target.
- Base term 10 years plus two 5-year options; total expected revenue ~$1.2B if fully exercised.
- Right of first offer for additional 32 MW within 2 years could raise contract value to >$3.0B.
- Retrofit cost of ~60,000 sq ft estimated at $100M-$120M for initial 20 MW deployment.
- Company to reallocate power from Bitcoin mining to AI; campus has potential for >300 MW total capacity.

## SEC filing metadata
- accession: 0001214659-26-007704
- form_type: 8-K
- ticker: GPUS
- cik: 0000896493
- company_name: Hyperscale Data, Inc.
- filed_at: 2026-06-24T20:30:29+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.85
- calibrated_materiality_score: 0.85
- confidence: high
- sec_items: 1.01, 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/896493/000121465926007704/0001214659-26-007704-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/896493/000121465926007704/x6242618k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001214659-26-007704
- JSON: https://secwatch.observer/filing/0001214659-26-007704.json
- Plain text: https://secwatch.observer/filing/0001214659-26-007704.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
