{"schema_version":"secwatch.filing_event.v1","accession":"0001437749-22-028817","form_type":"8-K","ticker":"EGY","cik":"0000894627","company_name":"VAALCO ENERGY INC /DE/","filed_at":"2022-12-09T23:59:59+00:00","discovered_at":"2026-05-14T18:03:53.912534+00:00","generated_at":"2026-06-21T07:12:22.337100+00:00","sec_items":["2.02","9.01"],"event_type":"other_material","sentiment":"negative","materiality_score":0.6,"calibrated_materiality_score":0.6,"confidence":"high","headline":"VAALCO's North Tchibala well producing ~275 bopd with potential for 1,500+ bopd","bullets":["Well in Gabon brought online early Nov; produced ~8,000 gross bbl through early Dec at ~275 bopd.","Only 33% of injected completion fluid recovered; cleanup continues; lower stimulated zones may not be contributing.","Post-frac modeling suggests well capable of rates at or above 1,500 gross bopd.","First lifting from new FSO TELI completed Dec 4; final Nautipa FPSO volumes removed.","In Egypt, first horizontal well expected to spud Dec 12; in Canada, 4-10 well tie-in late Dec, drilling starts Jan 2023."],"urls":{"canonical":"https://secwatch.observer/filing/0001437749-22-028817","json":"https://secwatch.observer/filing/0001437749-22-028817.json","markdown":"https://secwatch.observer/filing/0001437749-22-028817.md","text":"https://secwatch.observer/filing/0001437749-22-028817.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/894627/000143774922028817/0001437749-22-028817-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/894627/000143774922028817/egy20221209_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-21T07:12:22.337100+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}