---
schema_version: "secwatch.filing_event.v1"
accession: "0001437749-24-034006"
form_type: "8-K"
ticker: "UEC"
cik: "0001334933"
company_name: "URANIUM ENERGY CORP"
filed_at: "2024-11-07T23:59:59+00:00"
generated_at: "2026-05-30T03:22:28.020418+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.4
calibrated_materiality_score: 0.4
confidence: "low"
source: SEC EDGAR
---

# UEC completes S-K 1300 Technical Report for Roughrider Uranium Project

## Summary
- Technical Report Summary for Roughrider Project in Saskatchewan dated Nov 5, 2024.
- Report is an initial assessment under SEC S-K 1300 rules.
- Consents from Tetra Tech, Understood Mineral Resources, Terracon, Snowden Optiro, Clifton Engineering filed as exhibits.
- No financial or resource estimate details provided in this 8-K filing body.

## SEC filing metadata
- accession: 0001437749-24-034006
- form_type: 8-K
- ticker: UEC
- cik: 0001334933
- company_name: URANIUM ENERGY CORP
- filed_at: 2024-11-07T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.4
- calibrated_materiality_score: 0.4
- confidence: low
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1334933/000143774924034006/0001437749-24-034006-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1334933/000143774924034006/uec20241106_8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001437749-24-034006
- JSON: https://secwatch.observer/filing/0001437749-24-034006.json
- Plain text: https://secwatch.observer/filing/0001437749-24-034006.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
