---
schema_version: "secwatch.filing_event.v1"
accession: "0001437749-26-020154"
form_type: "8-K"
ticker: "ICCC"
cik: "0000811641"
company_name: "IMMUCELL CORP /DE/"
filed_at: "2026-06-10T20:05:18+00:00"
generated_at: "2026-06-10T20:06:45.678099+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# ImmuCell Board authorizes $3.5M First Defense capacity expansion, converting former Re-Tain facility

## Summary
- Board authorized first phase: renovate former Re-Tain facility and add new freeze dryer.
- Phase 1 expected to cost ~$3.5M and take approximately 12 months.
- Second phase will repurpose Re-Tain equipment and add automation for First Defense colostrum processing.
- Goal: strengthen ability to manufacture First Defense products to meet expected customer demand.

## SEC filing metadata
- accession: 0001437749-26-020154
- form_type: 8-K
- ticker: ICCC
- cik: 0000811641
- company_name: IMMUCELL CORP /DE/
- filed_at: 2026-06-10T20:05:18+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/811641/000143774926020154/0001437749-26-020154-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/811641/000143774926020154/iccc20260608_8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001437749-26-020154
- JSON: https://secwatch.observer/filing/0001437749-26-020154.json
- Plain text: https://secwatch.observer/filing/0001437749-26-020154.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
