---
schema_version: "secwatch.filing_event.v1"
accession: "0001437749-26-022810"
form_type: "8-K"
ticker: "SKYH"
cik: "0001823587"
company_name: "Sky Harbour Group Corp"
filed_at: "2026-07-06T20:50:11+00:00"
generated_at: "2026-07-06T20:51:08.356653+00:00"
event_type: "debt"
sentiment: "neutral"
materiality_score: 0.55
calibrated_materiality_score: 0.55
confidence: "high"
source: SEC EDGAR
---

# Sky Harbour amends term loan to allow $20M borrowing for Opa Locka Phase II project

## Summary
- Borrowed $20M under Term Loan Facility for second phase of Miami-Opa Locka Executive Airport construction.
- Must contribute at least $20M in cash to borrowers within 90 days, expected from Series 2026 Bond proceeds.
- Until replenishment, no new borrowings under facility and negative pledge on San José hangar campus.
- Borrowing not added to borrowing base; Opa Locka Phase II owner not a borrower.

## SEC filing metadata
- accession: 0001437749-26-022810
- form_type: 8-K
- ticker: SKYH
- cik: 0001823587
- company_name: Sky Harbour Group Corp
- filed_at: 2026-07-06T20:50:11+00:00
- event_type: debt
- sentiment: neutral
- materiality_score: 0.55
- calibrated_materiality_score: 0.55
- confidence: high
- sec_items: 1.01, 2.03, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1823587/000143774926022810/0001437749-26-022810-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1823587/000143774926022810/ysac20260701_8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001437749-26-022810
- JSON: https://secwatch.observer/filing/0001437749-26-022810.json
- Plain text: https://secwatch.observer/filing/0001437749-26-022810.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
