{"schema_version":"secwatch.filing_event.v1","accession":"0001477932-26-000494","form_type":"8-K","ticker":"ASPI","cik":"0001921865","company_name":"ASP Isotopes Inc.","filed_at":"2026-01-29T23:59:59+00:00","discovered_at":"2026-05-14T18:02:36.767443+00:00","generated_at":"2026-05-16T06:34:26.185430+00:00","sec_items":["7.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.75,"calibrated_materiality_score":0.75,"confidence":"high","headline":"ASP Isotopes reports 80% drilling success, 60% gas throughput increase at Renergen Helium Project","bullets":["15 of 18 wells hit gas (80% success) post-restart; Kinley Exploration engaged for reservoir modeling.","Gas throughput up ~60% vs pre-April 2025; plant upgrades including compressor and dewar filling system.","~60% of Phase 1 LNG offtake contracted; initial helium supply agreements in place.","Project on track for positive operational cash flow before end of 2026.","New shallow sandstone reservoir (<400m) with confirmed gas shows not in prior reserve estimates."],"urls":{"canonical":"https://secwatch.observer/filing/0001477932-26-000494","json":"https://secwatch.observer/filing/0001477932-26-000494.json","markdown":"https://secwatch.observer/filing/0001477932-26-000494.md","text":"https://secwatch.observer/filing/0001477932-26-000494.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1921865/000147793226000494/0001477932-26-000494-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1921865/000147793226000494/aspi_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-16T06:34:26.185430+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}