other material
confidence high
sentiment positive
materiality 0.60
Bunker Hill Mining advances underground decline, water treatment, and mill relocation at Idaho mine
Bunker Hill Mining Corp.
- Decline from 5 Level to 6 Level on track for Q3 2022 completion; ventilation fans operational for first time in 40 years.
- Pilot water treatment plant now operational; testing during spring freshet to inform full-scale system.
- Surface yard clean-up prepares site for Pend Oreille mill relocation; final location to be set in PFS.
- Prefeasibility study results on track for June 2022, along with formal construction decision.
- Update on Pend Oreille mill closing and demobilization expected in May 2022.