secwatch / observer
8-K filed September 6, 2023, 7:59 PM ET ticker ABAT CIK 0001576873
other material confidence high sentiment positive materiality 0.70

ABTC secures $57.7M DOE grant for lithium hydroxide facility

AMERICAN BATTERY TECHNOLOGY Co

Key facts

Extracted from this filing and checked against the source text.

Material Agreements SEC 8-K Item 1.01/1.02 confidence 0.95

AMERICAN BATTERY TECHNOLOGY Co entered into Assistance Agreement with United States Department of Energy valued at total project value $115,489,662; DOE share $57,744,831; Company cost share $57,744,831 (effective 2023-09-01).

Action
entry
Counterparty
United States Department of Energy
Value
total project value $115,489,662; DOE share $57,744,831; Company cost share $57,744,831
Effective
2023-09-01
Exact text from the filing
On September 1, 2023, American Battery Technology Company (the “Company”) and the United States Department of Energy (the “DOE”) entered into an Assistance Agreement (the “Grant”), award number DE-MS0000010, for a $115,489,662 project for the design, construction, commissioning, and operation of a commercial scale facility for the manufacturing of battery cathode grade lithium hydroxide from unconventional Nevada-based lithium-bearing sedimentary resources.
View on SEC.gov

233 material agreements filed in the last 30 days. Browse all material agreements →

AMERICAN BATTERY TECHNOLOGY Co filing history →

Source: SEC EDGAR
accession 0001493152-23-031735
Machine-readable: JSON · Markdown · Plain text

This headline and bullets were generated automatically by deepseek-v4-flash:cloud@v2 from the public filing. Read the source on SEC.gov before relying on any specific claim. Not investment advice. See methodology for how this pipeline works.