secwatch.observer — SEC 8-K summary ====================================== Issuer: CalEthos, Inc. (GEDC) CIK: 0001174891 Form: 8-K Filed at: 2023-12-07T23:59:59+00:00 Accession: 0001493152-23-043954 Event type: other_material Sentiment: positive Materiality: 0.50 Item codes: 8.01, 9.01 LLM model: deepseek-v4-flash:cloud@v2 CalEthos completes Phase I of 300MW clean energy data center campus in Southern California -------------------------------------------------------------------------------- - Assembled team of data center veterans from Microsoft, Google, Meta, NTT, CenturyLink and Global Switch. - Contracted to purchase 80 acres of industrial-zoned land adjacent to geothermal plants in Lithium Valley, CA. - Hired HDR Engineering, ZGlobal and American Dark Fiber for design, grid connectivity and fiber network planning. - Phase I (feasibility, site plan, energy/fiber engineering) complete as of Dec 1, 2023; Phase II to begin. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1174891/000149315223043954/0001493152-23-043954-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/1174891/000149315223043954/form8-k.htm HTML page: https://secwatch.observer/filing/0001493152-23-043954 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer