---
schema_version: "secwatch.filing_event.v1"
accession: "0001493152-24-009599"
form_type: "8-K"
ticker: "BLNK"
cik: "0001429764"
company_name: "Blink Charging Co."
filed_at: "2024-03-11T23:59:59+00:00"
generated_at: "2026-06-04T23:44:24.865199+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.55
calibrated_materiality_score: 0.55
confidence: "high"
source: SEC EDGAR
---

# Blink Charging moves HQ to Bowie, MD; plans 30,000 sq ft factory to boost capacity to 50,000 units/yr

## Summary
- New global HQ in 15,000 sq ft facility at 5081 Howerton Way, Bowie, MD; concurrent 30,000 sq ft LEED Gold production facility.
- Current annual output of 15,000 EV chargers; target to over 50,000 units annually.
- New facility to manufacture Series 6, 7, and 8 L2 chargers; aligns with Build America, Buy America Act.
- Plans Blink Center of Charging Excellence with interoperability testing, MET Labs certification, test events, and R&D lab.
- Grand opening attended by White House National Climate Advisor and Maryland Governor.

## SEC filing metadata
- accession: 0001493152-24-009599
- form_type: 8-K
- ticker: BLNK
- cik: 0001429764
- company_name: Blink Charging Co.
- filed_at: 2024-03-11T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.55
- calibrated_materiality_score: 0.55
- confidence: high
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1429764/000149315224009599/0001493152-24-009599-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1429764/000149315224009599/form8-k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001493152-24-009599
- JSON: https://secwatch.observer/filing/0001493152-24-009599.json
- Plain text: https://secwatch.observer/filing/0001493152-24-009599.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
