{"schema_version":"secwatch.filing_event.v1","accession":"0001493152-24-015942","form_type":"8-K","ticker":"ABAT","cik":"0001576873","company_name":"AMERICAN BATTERY TECHNOLOGY Co","filed_at":"2024-04-25T23:59:59+00:00","discovered_at":"2026-05-14T18:03:19.046921+00:00","generated_at":"2026-06-03T07:58:16.219408+00:00","sec_items":["8.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.7,"calibrated_materiality_score":0.7,"confidence":"high","headline":"ABTC updates Tonopah Flats Lithium Project Initial Assessment; NPV-10 rises to $4.67B","bullets":["Updated Initial Assessment uses only Measured and Indicated resources, excluding Inferred resources.","Total claystone processed over life of mine reduced 7% to 597M tons; average grade up 8% to 4,111 ppm LHM.","Average production costs down 7% to $4,302/ton LHM; NPV-10 up 6% to $4.67B.","Measured+Indicated resource: 3.16B tons at 596 ppm Li, 11,400 kTons LHM.","Company received DOE grants: $4.5M for pilot plant and $115M for commercial refinery."],"urls":{"canonical":"https://secwatch.observer/filing/0001493152-24-015942","json":"https://secwatch.observer/filing/0001493152-24-015942.json","markdown":"https://secwatch.observer/filing/0001493152-24-015942.md","text":"https://secwatch.observer/filing/0001493152-24-015942.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1576873/000149315224015942/0001493152-24-015942-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1576873/000149315224015942/form8-k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-03T07:58:16.219408+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}