---
schema_version: "secwatch.filing_event.v1"
accession: "0001493152-25-005824"
form_type: "8-K"
ticker: "USAU"
cik: "0000027093"
company_name: "U.S. GOLD CORP."
filed_at: "2025-02-11T23:59:59+00:00"
generated_at: "2026-05-26T23:34:52.512623+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.8
calibrated_materiality_score: 0.8
confidence: "high"
source: SEC EDGAR
---

# U.S. Gold reports updated PFS for CK Gold Project: $459M NPV, 36% IRR pre-tax

## Summary
- Base case pre-tax NPV $459M (5% discount) and IRR 36.0%; NPV improved 42% over prior PFS.
- Average AuEq production 111,250 oz/yr over 10.2-year mine life; first 3 yrs avg 143,278 oz/yr.
- Initial capex $277M; all-in sustaining cost $937 per AuEq oz (life-of-mine average).
- Mineral reserves up 16% to 1.672M AuEq oz; includes 1.022M oz gold, 259.7M lbs copper, 3.008M oz silver.
- Company plans to complete feasibility study by end of 2025, leveraging completed permitting.

## SEC filing metadata
- accession: 0001493152-25-005824
- form_type: 8-K
- ticker: USAU
- cik: 0000027093
- company_name: U.S. GOLD CORP.
- filed_at: 2025-02-11T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.8
- calibrated_materiality_score: 0.8
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/27093/000149315225005824/0001493152-25-005824-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/27093/000149315225005824/form8-k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001493152-25-005824
- JSON: https://secwatch.observer/filing/0001493152-25-005824.json
- Plain text: https://secwatch.observer/filing/0001493152-25-005824.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
