---
schema_version: "secwatch.filing_event.v1"
accession: "0001493152-25-006772"
form_type: "8-K"
ticker: "USAU"
cik: "0000027093"
company_name: "U.S. GOLD CORP."
filed_at: "2025-02-14T23:59:59+00:00"
generated_at: "2026-05-26T21:44:24.809755+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "medium"
source: SEC EDGAR
---

# U.S. Gold Corp. completes pre-feasibility study for CK Gold Project

## Summary
- Technical Report Summary dated Feb 10, 2025, for CK Gold Project in Laramie County, Wyoming.
- Study prepared by company and Samuel Engineering, Inc. under SEC S-K 1300 standards.
- Report details updated pre-feasibility results; specific economics not disclosed in this filing.

## SEC filing metadata
- accession: 0001493152-25-006772
- form_type: 8-K
- ticker: USAU
- cik: 0000027093
- company_name: U.S. GOLD CORP.
- filed_at: 2025-02-14T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: medium
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/27093/000149315225006772/0001493152-25-006772-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/27093/000149315225006772/form8-k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001493152-25-006772
- JSON: https://secwatch.observer/filing/0001493152-25-006772.json
- Plain text: https://secwatch.observer/filing/0001493152-25-006772.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
