other_material
confidence high
sentiment positive
materiality 0.65
NexMetals intersects 32.6m of massive sulphide at Selebi North; assays pending
NexMetals Mining Corp.
- Drill hole SNUG-25-194 intersected 32.60 metres of continuous mineralization, including 19.90m of massive sulphide across five sub-intervals.
- Intersection bridges two widely spaced step-out holes — SNUG-25-184 (183m down-plunge) and SNUG-25-186 (further 130m step-out).
- Results will be incorporated into future updated MRE, supporting potential expansion of the resource envelope.
- BHEM surveys planned to characterize conductive trends and outline strike extent; assays pending for SNUG-25-194 and two additional holes.
item 8.01item 9.01