{"schema_version":"secwatch.filing_event.v1","accession":"0001493152-25-018037","form_type":"8-K","ticker":"ABAT","cik":"0001576873","company_name":"AMERICAN BATTERY TECHNOLOGY Co","filed_at":"2025-10-14T23:59:59+00:00","discovered_at":"2026-05-14T18:02:39.802529+00:00","generated_at":"2026-05-17T03:53:48.717944+00:00","sec_items":["7.01","9.01"],"event_type":"regulatory","sentiment":"neutral","materiality_score":0.6,"calibrated_materiality_score":0.6,"confidence":"high","headline":"American Battery Technology completes NEPA baseline studies for Tonopah Flats Lithium Project","bullets":["Completed 21 baseline studies across 14 categories after 2+ years of efforts for the TFLP in Nevada.","Submitted all baseline reports to BLM for NEPA review, a prerequisite for formal permitting phase.","Submitted Mine Plan of Operations (MPO) currently under BLM review.","Project selected as FAST-41 Covered Priority Project in June 2025; received $900M EXIM letter of interest.","Company preparing for Pre-Feasibility Study to evaluate technical and economic feasibility."],"urls":{"canonical":"https://secwatch.observer/filing/0001493152-25-018037","json":"https://secwatch.observer/filing/0001493152-25-018037.json","markdown":"https://secwatch.observer/filing/0001493152-25-018037.md","text":"https://secwatch.observer/filing/0001493152-25-018037.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1576873/000149315225018037/0001493152-25-018037-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1576873/000149315225018037/form8-k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-17T03:53:48.717944+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}