{"schema_version":"secwatch.filing_event.v1","accession":"0001493152-25-022111","form_type":"8-K","ticker":"SLNH","cik":"0000064463","company_name":"Soluna Holdings, Inc","filed_at":"2025-11-13T23:59:59+00:00","discovered_at":"2026-05-14T18:02:41.902477+00:00","generated_at":"2026-05-16T20:43:04.008372+00:00","sec_items":["7.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.8,"calibrated_materiality_score":0.8,"confidence":"high","headline":"Soluna completes 48 MW Project Dorothy 2; total capacity rises to 123 MW","bullets":["Project Dorothy 2 fully energized at 48 MW, on time and on budget; total campus now 98 MW.","Total energized capacity increased 73.3% since April 2025 to 123 MW, over 5 EH/s compute.","Operating metrics: >30,000 mining rigs, >3.9 EH/s hashrate, 24 J/TH efficiency, >94% uptime.","Annual energy consumption ~80,000 MWh of curtailed wind energy at $32.5/MWh; 18 local jobs.","Next project: 166 MW Project Kati currently under construction for future expansion."],"urls":{"canonical":"https://secwatch.observer/filing/0001493152-25-022111","json":"https://secwatch.observer/filing/0001493152-25-022111.json","markdown":"https://secwatch.observer/filing/0001493152-25-022111.md","text":"https://secwatch.observer/filing/0001493152-25-022111.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/64463/000149315225022111/0001493152-25-022111-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/64463/000149315225022111/form8-k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-16T20:43:04.008372+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}