secwatch.observer — SEC 8-K summary ====================================== Issuer: Soluna Holdings, Inc (SLNH) CIK: 0000064463 Form: 8-K Filed at: 2025-11-13T23:59:59+00:00 Accession: 0001493152-25-022111 Event type: other_material Sentiment: positive Materiality: 0.80 Item codes: 7.01, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Soluna completes 48 MW Project Dorothy 2; total capacity rises to 123 MW ------------------------------------------------------------------------ - Project Dorothy 2 fully energized at 48 MW, on time and on budget; total campus now 98 MW. - Total energized capacity increased 73.3% since April 2025 to 123 MW, over 5 EH/s compute. - Operating metrics: >30,000 mining rigs, >3.9 EH/s hashrate, 24 J/TH efficiency, >94% uptime. - Annual energy consumption ~80,000 MWh of curtailed wind energy at $32.5/MWh; 18 local jobs. - Next project: 166 MW Project Kati currently under construction for future expansion. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000149315225022111/0001493152-25-022111-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/64463/000149315225022111/form8-k.htm HTML page: https://secwatch.observer/filing/0001493152-25-022111 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer