{"schema_version":"secwatch.filing_event.v1","accession":"0001493152-25-024405","form_type":"8-K","ticker":"NXXT","cik":"0001817004","company_name":"NEXTNRG, INC.","filed_at":"2025-11-20T23:59:59+00:00","discovered_at":"2026-05-14T18:02:40.571614+00:00","generated_at":"2026-05-16T18:09:01.714363+00:00","sec_items":["1.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.6,"calibrated_materiality_score":0.6,"confidence":"high","headline":"NextNRG enters two 28-year solar+storage PPAs with California nursing facilities","bullets":["Sunnyside PPA: 409 kW solar + 300 kW/1,200 kWh battery, 28-year term, anticipated COD Oct 30, 2026.","Topanga PPA: 350 kW solar + 250 kW/1,000 kWh battery, 28-year term, anticipated COD Oct 30, 2026.","Systems are roof-mounted at nursing facilities in Torrance and Canoga Park, CA.","Seller retains all Environmental Attributes, incentives, and tax credits.","Both PPAs include Purchaser option to buy system at fair market value at specified times."],"urls":{"canonical":"https://secwatch.observer/filing/0001493152-25-024405","json":"https://secwatch.observer/filing/0001493152-25-024405.json","markdown":"https://secwatch.observer/filing/0001493152-25-024405.md","text":"https://secwatch.observer/filing/0001493152-25-024405.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1817004/000149315225024405/0001493152-25-024405-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1817004/000149315225024405/form8-k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-16T18:09:01.714363+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}