other_material
confidence high
sentiment positive
materiality 0.55
NexMetals intersects 11.05m of sulphide mineralization at Selebi Main; extends resource potential
NexMetals Mining Corp.
- Hole SMD-25-205 intercepted 11.05 m of mineralization including two massive sulphide intervals of 3.50 m and 5.80 m.
- First hinge hole SMD-25-201 hit 3 m of massive sulphides in Lower Zone, the thickest ever at Selebi Main.
- BHEM survey identified 'Super Conductor' anomaly, the highest-amplitude response on the property.
- Historic hole sd144 extended 660.7 m; BHEM redirected targeting to a high-priority area north of SMD-25-207.
- All planned hinge holes intersected mineralization, confirming continuity between Selebi Main and North deposits.
item 7.01item 9.01