secwatch.observer — SEC 8-K summary ====================================== Issuer: Soluna Holdings, Inc (SLNH) CIK: 0000064463 Form: 8-K Filed at: 2026-02-10T23:59:59+00:00 Accession: 0001493152-26-005888 Event type: other_material Sentiment: positive Materiality: 0.75 Item codes: 7.01, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Soluna begins energization of 83 MW wind-powered data center Project Kati 1 --------------------------------------------------------------------------- - Project Kati 1 is an 83 MW wind-powered data center campus in South Texas dedicated to Bitcoin mining. - Kati 1A (48 MW) expected fully ramped by early Q2; Kati 1B (35 MW) expected complete by end of Q3. - Anticipated annual revenue $17.3–$19.6 million; projected hashrate capacity 3.5 EH/s. - Total capacity increases by >67% to exceed 200 MW; includes a 12 MW deployment with Cormint. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000149315226005888/0001493152-26-005888-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/64463/000149315226005888/form8-k.htm HTML page: https://secwatch.observer/filing/0001493152-26-005888 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer