# Soluna names new CFO, launches 350MW AI campus JV with Metrobloks

## Summary
- Michael Picchi appointed CFO effective April 1, 2026.
- Joint venture with Metrobloks to build a 350MW Tier 3 AI campus (7 buildings) at Project Kati 2.
- ERCOT energization approval secured for Project Kati 1; 24 MW commissioning started, due Feb.
- Customer deploying 20 MW fleet upgrade at Dorothy 1A, completion by end of February.
- Over 500 additional acres of land secured for the expanded Kati 2 campus.

## SEC filing metadata
- accession: 0001493152-26-006304
- form_type: 8-K
- ticker: SLNH
- cik: 0000064463
- company_name: Soluna Holdings, Inc
- filed_at: 2026-02-12T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000149315226006304/0001493152-26-006304-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/64463/000149315226006304/form8-k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001493152-26-006304
- JSON: https://secwatch.observer/filing/0001493152-26-006304.json
- Plain text: https://secwatch.observer/filing/0001493152-26-006304.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.