---
schema_version: "secwatch.filing_event.v1"
accession: "0001493152-26-006929"
form_type: "8-K"
ticker: "SLNH"
cik: "0000064463"
company_name: "Soluna Holdings, Inc"
filed_at: "2026-02-17T23:59:59+00:00"
generated_at: "2026-05-16T02:37:47.161808+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.55
calibrated_materiality_score: 0.55
confidence: "high"
source: SEC EDGAR
---

# Soluna expands Blockware partnership by 6 MW at Dorothy 1 site in Texas

## Summary
- Third expansion of partnership; adds 6 MW capacity at existing Dorothy 1 site.
- Deployment began January 2026, expected completion by end of February 2026.
- CEO John Belizaire says repeat expansions signal model is working and long-term alignment.
- Soluna provides renewable-powered, behind-the-meter digital infrastructure for Bitcoin mining and AI.

## SEC filing metadata
- accession: 0001493152-26-006929
- form_type: 8-K
- ticker: SLNH
- cik: 0000064463
- company_name: Soluna Holdings, Inc
- filed_at: 2026-02-17T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.55
- calibrated_materiality_score: 0.55
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000149315226006929/0001493152-26-006929-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/64463/000149315226006929/form8-k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001493152-26-006929
- JSON: https://secwatch.observer/filing/0001493152-26-006929.json
- Plain text: https://secwatch.observer/filing/0001493152-26-006929.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
