---
schema_version: "secwatch.filing_event.v1"
accession: "0001493152-26-009444"
form_type: "8-K"
ticker: "SLNH"
cik: "0000064463"
company_name: "Soluna Holdings, Inc"
filed_at: "2026-03-10T23:59:59+00:00"
generated_at: "2026-05-15T17:17:42.804567+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.5
calibrated_materiality_score: 0.5
confidence: "medium"
source: SEC EDGAR
---

# Soluna reports Feb 2026 hosted hashrate 3,883 PH/s; 9.5 BTC mined, up from Jan

## Summary
- Hosted hashrate avg 3,883 PH/s (Jan: 3,590); self-mining 760 PH/s; 9.5 BTC mined (Jan: 9.2).
- Blockware completed 6 MW expansion at Project Dorothy 1; Canaan deployment ongoing for 11 MW.
- Project Kati: Phase 1 (24 MW) fully commissioned; Phases 2 & 3 on track for March completion.
- Project Kati 2: discussions for 350 MW critical IT capacity; power equipment procurement begun.
- Pipeline: PPAs for Project Rosa being finalized; land due diligence for multiple projects ongoing.

## SEC filing metadata
- accession: 0001493152-26-009444
- form_type: 8-K
- ticker: SLNH
- cik: 0000064463
- company_name: Soluna Holdings, Inc
- filed_at: 2026-03-10T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.5
- calibrated_materiality_score: 0.5
- confidence: medium
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000149315226009444/0001493152-26-009444-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/64463/000149315226009444/form8-k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001493152-26-009444
- JSON: https://secwatch.observer/filing/0001493152-26-009444.json
- Plain text: https://secwatch.observer/filing/0001493152-26-009444.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
