---
schema_version: "secwatch.filing_event.v1"
accession: "0001493152-26-018940"
form_type: "8-K"
ticker: "AVX"
cik: "0001826397"
company_name: "AVAX ONE TECHNOLOGY LTD."
filed_at: "2026-04-24T23:59:59+00:00"
generated_at: "2026-05-15T04:13:47.131948+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.7
calibrated_materiality_score: 0.7
confidence: "high"
source: SEC EDGAR
---

# AVAX One announces development of 10 MW AI/HPC powered land in Alberta; cost $30-35M

## Summary
- Signed LOI with BlueFlare Energy Solutions for 10 MW Tier 3 AI/HPC facility near Calgary, Alberta.
- Target delivery Q1 2027; primary power from natural gas, BESS, diesel backup for resiliency.
- Total project cost estimated at $30-35 million; will generate recurring revenue under long-term infrastructure agreement.
- Expansion positions AVAX One at intersection of digital assets and AI/HPC compute infrastructure.

## SEC filing metadata
- accession: 0001493152-26-018940
- form_type: 8-K
- ticker: AVX
- cik: 0001826397
- company_name: AVAX ONE TECHNOLOGY LTD.
- filed_at: 2026-04-24T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.7
- calibrated_materiality_score: 0.7
- confidence: high
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1826397/000149315226018940/0001493152-26-018940-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1826397/000149315226018940/form8-k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001493152-26-018940
- JSON: https://secwatch.observer/filing/0001493152-26-018940.json
- Plain text: https://secwatch.observer/filing/0001493152-26-018940.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
