secwatch.observer — SEC 8-K summary ====================================== Issuer: Soluna Holdings, Inc (SLNH) CIK: 0000064463 Form: 8-K Filed at: 2026-08-24T11:30:42+00:00 Accession: 0001493152-26-039781 Event type: other_material Sentiment: positive Materiality: 0.50 Item codes: 7.01, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Soluna closes purchase of 397 acres in Texas for 300 MW AI campus Project Dorothy 3 -------------------------------------------------------------------------------- - Closed purchase of 397 acres in Briscoe County, Texas for Project Dorothy 3, a planned 300 MW renewable-first AI computing campus. - Site sits adjacent to Projects Dorothy 1 and 2 and the 150 MW Briscoe Wind Farm acquired in April; substation across the road enables behind-the-meter power. - 397 acres exceed the 300 acres originally identified, leaving room for additional data halls if more generation or storage becomes available. - Development pipeline totals ~6.3 GW; Soluna currently operates ~192 MW of energized capacity. - CEO John Belizaire: owning the land removes a variable for customers evaluating AI sites and lets them plan around the site. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000149315226039781/0001493152-26-039781-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/64463/000149315226039781/form8-k.htm HTML page: https://secwatch.observer/filing/0001493152-26-039781 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer