---
schema_version: "secwatch.filing_event.v1"
accession: "0001493152-26-039964"
form_type: "8-K"
ticker: "SLNH"
cik: "0000064463"
company_name: "Soluna Holdings, Inc"
filed_at: "2026-08-25T11:30:17+00:00"
generated_at: "2026-08-25T11:35:49.369424+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.65
calibrated_materiality_score: 0.65
confidence: "high"
source: SEC EDGAR
---

# Soluna signs co-mining deal with Bitdeer for 28 MW / 1.93 EH/s at Project Kati 1

## Summary
- Bitdeer subsidiary Dory Creek to deploy ~28 MW of mining equipment (~1.93 EH/s) at Soluna's Project Kati 1 in South Texas.
- Deployment begins September 2026, ramping in batches; co-mining structure shares mining proceeds between Soluna and Bitdeer.
- Soluna provides site, power, and turnkey operations; Bitdeer owns its Sealminer A2 Pro Air equipment.
- Project Kati 1 is an 83 MW wind-powered data center in Willacy County, Texas; delivered first gross profit in Q2 2026.
- Soluna operates 192 MW across four sites with 14 MW under construction and 6.3 GW development pipeline.

## SEC filing metadata
- accession: 0001493152-26-039964
- form_type: 8-K
- ticker: SLNH
- cik: 0000064463
- company_name: Soluna Holdings, Inc
- filed_at: 2026-08-25T11:30:17+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.65
- calibrated_materiality_score: 0.65
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000149315226039964/0001493152-26-039964-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/64463/000149315226039964/form8-k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001493152-26-039964
- JSON: https://secwatch.observer/filing/0001493152-26-039964.json
- Plain text: https://secwatch.observer/filing/0001493152-26-039964.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
