secwatch.observer — SEC 8-K summary ====================================== Issuer: Soluna Holdings, Inc (SLNH) CIK: 0000064463 Form: 8-K Filed at: 2026-08-25T11:30:17+00:00 Accession: 0001493152-26-039964 Event type: other_material Sentiment: positive Materiality: 0.65 Item codes: 7.01, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Soluna signs co-mining deal with Bitdeer for 28 MW / 1.93 EH/s at Project Kati 1 -------------------------------------------------------------------------------- - Bitdeer subsidiary Dory Creek to deploy ~28 MW of mining equipment (~1.93 EH/s) at Soluna's Project Kati 1 in South Texas. - Deployment begins September 2026, ramping in batches; co-mining structure shares mining proceeds between Soluna and Bitdeer. - Soluna provides site, power, and turnkey operations; Bitdeer owns its Sealminer A2 Pro Air equipment. - Project Kati 1 is an 83 MW wind-powered data center in Willacy County, Texas; delivered first gross profit in Q2 2026. - Soluna operates 192 MW across four sites with 14 MW under construction and 6.3 GW development pipeline. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000149315226039964/0001493152-26-039964-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/64463/000149315226039964/form8-k.htm HTML page: https://secwatch.observer/filing/0001493152-26-039964 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer