other material
confidence high
sentiment positive
materiality 0.60
NexMetals reports 7.55m at 6.48% CuEq; extends Selebi Main trend to 1.5km
NexMetals Mining Corp.
- SMD-26-219 returned 7.55m grading 6.48% CuEq (2.70% Cu, 1.83% Ni) at Selebi Main deposit.
- SMD-26-217 intersected 38.65m of sulphide mineralization across three zones, including a new Third Zone, extending high-grade trend to ~1.5km.
- 2026 MRE on track for Q3 2026; holes drilled after Sept 21 cut-off, including SMD-26-217, excluded from resource.
- Results continue to support growth beyond 2024 MRE; BHEM indicates trend continues beyond SMD-26-217.