secwatch.observer — SEC 8-K summary ====================================== Issuer: Soluna Holdings, Inc (SLNH) CIK: 0000064463 Form: 8-K Filed at: 2026-09-28T11:30:28+00:00 Accession: 0001493152-26-044444 Event type: other_material Sentiment: positive Materiality: 0.60 Item codes: 7.01, 9.01 LLM model: deepseek-v4.1-flash:cloud@v2 Soluna expands Bitdeer deal to 35 MW at Project Kati 1 with ~7 MW addition -------------------------------------------------------------------------- - Bitdeer subsidiary Dory Creek will deploy ~7 MW of additional Bitcoin mining equipment at Soluna's Project Kati 1 in South Texas, lifting total deployment to 35 MW and ~2.42 EH/s. - This is the first expansion under the co-mining structure Soluna introduced in August; Bitdeer owns its Sealminer A2 Pro Air equipment and both parties share mining proceeds. - Project Kati 1 is an 83 MW wind-powered data center in Willacy County, Texas; its K1BC phase is now fully subscribed and completion is expected in November 2026. - Soluna (NASDAQ: SLNH) supplies site, power and turnkey operations; Bitdeer Technologies Group (NASDAQ: BTDR) provides and owns the mining equipment. - CEO John Belizaire said the agreement was expanded before the initial deployment finished, calling Kati 1 'fully spoken for.' Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000149315226044444/0001493152-26-044444-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/64463/000149315226044444/form8-k.htm HTML page: https://secwatch.observer/filing/0001493152-26-044444 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer