secwatch.observer — SEC 8-K summary ====================================== Issuer: Datacentrex, Inc. (DTCX) CIK: 0001853825 Form: 8-K Filed at: 2026-10-14T12:30:21+00:00 Accession: 0001493152-26-046935 Event type: other_material Sentiment: positive Materiality: 0.45 Item codes: 8.01, 9.01 LLM model: deepseek-v4.1-flash:cloud@v2 Datacentrex energizes 500+ ElphaPex DG2 miners, lifting online Scrypt hashrate ~21% to 52.2 TH/s -------------------------------------------------------------------------------- - Installation and energization began Oct 14, 2026 for more than 500 previously announced ElphaPex DG2 Scrypt ASIC miners; units were prepaid with no incremental hardware spend. - Online Scrypt hashrate expected to rise ~9.0 TH/s, or ~21%, from 43.2 TH/s to approximately 52.2 TH/s once fully energized over the coming weeks. - Total installed fleet now exceeds 3,500 Scrypt ASIC miners across four geographically diversified U.S. colocation facilities. - Deployed power capacity expected to grow from roughly 12.5 MW to approximately 14 MW. - CEO Parker Scott said initial units are online and already contributing to hashrate production. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1853825/000149315226046935/0001493152-26-046935-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/1853825/000149315226046935/form8-k.htm HTML page: https://secwatch.observer/filing/0001493152-26-046935 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer