{"schema_version":"secwatch.filing_event.v1","accession":"0001534504-25-000019","form_type":"8-K","ticker":"PBF","cik":"0001534504","company_name":"PBF Energy Inc.","filed_at":"2025-03-06T23:59:59+00:00","discovered_at":"2026-05-14T18:03:03.925178+00:00","generated_at":"2026-05-25T05:55:33.166529+00:00","sec_items":["7.01","9.01"],"event_type":"other_material","sentiment":"neutral","materiality_score":0.7,"calibrated_materiality_score":0.7,"confidence":"high","headline":"PBF Energy intends to restart Martinez refinery in two stages; insurance coverage expected","bullets":["Refinery (157,000 bpd) shut since Feb 1 fire; crude unit restart early Q2 2025, full restart by Q4 2025.","Stage-one throughput: 85,000–105,000 bpd, limited gasoline, jet fuel, and intermediates production.","Repair costs largely covered by insurance, subject to $30M deductible/retentions.","Business interruption insurance from April 3, 2025, to offset lost margin and ongoing costs.","Restart timing depends on permits, equipment availability, and regulatory approvals."],"urls":{"canonical":"https://secwatch.observer/filing/0001534504-25-000019","json":"https://secwatch.observer/filing/0001534504-25-000019.json","markdown":"https://secwatch.observer/filing/0001534504-25-000019.md","text":"https://secwatch.observer/filing/0001534504-25-000019.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1534504/000153450425000019/0001534504-25-000019-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1534504/000153450425000019/pbf-20250306.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-25T05:55:33.166529+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}