---
schema_version: "secwatch.filing_event.v1"
accession: "0001558370-24-016086"
form_type: "8-K"
ticker: "AGX"
cik: "0000100591"
company_name: "ARGAN INC"
filed_at: "2024-12-09T23:59:59+00:00"
generated_at: "2026-05-29T05:26:41.543485+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# Argan subsidiary Gemma Power Systems lands EPC contract for 700 MW natural gas plant

## Summary
- Gemma Power Systems received full notice to proceed on EPC contract for ~700 MW combined-cycle gas plant.
- Contract value will be added to project backlog in quarter ending January 31, 2025.
- No specific contract value was disclosed in the filing.
- The plant is located in the United States.

## SEC filing metadata
- accession: 0001558370-24-016086
- form_type: 8-K
- ticker: AGX
- cik: 0000100591
- company_name: ARGAN INC
- filed_at: 2024-12-09T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 8.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/100591/000155837024016086/0001558370-24-016086-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/100591/000155837024016086/agx-20241209x8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001558370-24-016086
- JSON: https://secwatch.observer/filing/0001558370-24-016086.json
- Plain text: https://secwatch.observer/filing/0001558370-24-016086.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
