---
schema_version: "secwatch.filing_event.v1"
accession: "0001558370-25-000674"
form_type: "8-K"
ticker: "AGX"
cik: "0000100591"
company_name: "ARGAN INC"
filed_at: "2025-02-06T23:59:59+00:00"
generated_at: "2026-05-27T01:19:05.301270+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "medium"
source: SEC EDGAR
---

# Argan's Gemma Power Systems secures EPC contract for 1.2 GW Texas gas plant

## Summary
- Construction on the 1.2 GW Lee County plant begins summer 2025; completion targeted for 2028.
- The ultra-efficient combined-cycle plant will supply power to 800,000 homes within the ERCOT grid.
- Turbines are Siemens SGT6-9000HL units capable of hydrogen blending with minor modifications.
- No contract value disclosed; project material to Argan but terms remain confidential.
- Gemma CEO cites critical need for additional power capacity to meet growing demand.

## SEC filing metadata
- accession: 0001558370-25-000674
- form_type: 8-K
- ticker: AGX
- cik: 0000100591
- company_name: ARGAN INC
- filed_at: 2025-02-06T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: medium
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/100591/000155837025000674/0001558370-25-000674-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/100591/000155837025000674/agx-20250206x8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001558370-25-000674
- JSON: https://secwatch.observer/filing/0001558370-25-000674.json
- Plain text: https://secwatch.observer/filing/0001558370-25-000674.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
