---
schema_version: "secwatch.filing_event.v1"
accession: "0001558370-25-004549"
form_type: "8-K"
ticker: "AGX"
cik: "0000100591"
company_name: "ARGAN INC"
filed_at: "2025-04-07T23:59:59+00:00"
generated_at: "2026-05-23T19:18:59.413954+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# Argan subsidiary Gemma Power gets notice to proceed on 1.2 GW Texas gas plant

## Summary
- Gemma Power Systems received notice to proceed on EPC contract for a 1.2 GW natural gas-fired plant in Lee County, Texas.
- Construction expected to start summer 2025, with completion targeted for 2028.
- Plant will use two Siemens SGT6-9000HL gas turbines capable of hydrogen operation.
- Project added to Argan's project backlog; previously announced but now proceeding.

## SEC filing metadata
- accession: 0001558370-25-004549
- form_type: 8-K
- ticker: AGX
- cik: 0000100591
- company_name: ARGAN INC
- filed_at: 2025-04-07T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/100591/000155837025004549/0001558370-25-004549-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/100591/000155837025004549/agx-20250407x8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001558370-25-004549
- JSON: https://secwatch.observer/filing/0001558370-25-004549.json
- Plain text: https://secwatch.observer/filing/0001558370-25-004549.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
