secwatch.observer — SEC 8-K summary ====================================== Issuer: UR-ENERGY INC (URG) CIK: 0001375205 Form: 8-K Filed at: 2025-04-17T23:59:59+00:00 Accession: 0001558370-25-004973 Event type: other_material Sentiment: positive Materiality: 0.60 Item codes: 2.02, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Ur-Energy reports Q1 operational progress; Lost Creek production ramping, Shirley Basin on track for early 2026 startup -------------------------------------------------------------------------------- - Lost Creek dried/packaged 83,066 lbs U3O8 in Q1; wellfield flow up 44% since Mar, now >2,700 gpm; annualized rate >400,000 lbs. - 2025 delivery commitment: 440,000 lbs to customers plus 250,000-lb loan repayment (may be deferred). - Shirley Basin construction on target for startup early 2026; completed road upgrade, monitor wells, building refurbishment saved several million. - 2025 plans: upgrade substation, install first header house, build satellite plant enclosure, two evaporation ponds. - President Trump's Section 232 probe into uranium imports could positively impact Ur-Energy. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1375205/000155837025004973/0001558370-25-004973-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/1375205/000155837025004973/urg-20250417x8k.htm HTML page: https://secwatch.observer/filing/0001558370-25-004973 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer